National Air Hygiene Risk Assessments
A comprehensive clean of all systems is not always necessary and a simple Air Hygiene Risk Assessment is all that is required.
NAP Air Hygiene provides comprehensive tailor-made indoor air quality risk assessments to ascertain the health of your systems and buildings and make recommendations for cleaning based on the standards in BS EN 15780. We also adhere to the BESA TR19 industry standard. All our cleaning is done to meet this standard; the Regulation that enforces the requirement to test the air is the Workplace (Health, Safety & Welfare) Act 1992 Regulation 6.
Photographs and testing of dust levels, microbiological counts, gas build-ups, air quality make-up, temperature and humidity levels can all be measured and analysed to present a thorough health check appropriate to each building and client requirements with calls to action to ensure compliance.
Our Other Services
Ductwork Cleaning
-
Compliance with legal requirements as set out in The Workplace (Health, Safety and Welfare) Regulation 1992
-
Modern duct cleaning equipment and techniques
-
Comprehensive report complete with photographs
All ductwork ventilation systems are protected by filters however, these filters do not protect from all fine dusts and microbiological contaminants and over time dust and dirt will build up in your systems.
National Fire Damper Testing Specialists
-
Compliance with legal requirements set out in Regulatory Reform (Fire Safety) Order 2005
-
Fully trained experienced staff to carry out testing and remedial actions
-
Comprehensive condition report complete with photographs
The onus is on you as a building owner/manager to ensure you have up to date service records for all matters pertaining to your buildings Fire Safety systems and their routine maintenance.
Smoke Vent Testing
Smoke ventilation system service works are also an essential legal requirement in buildings where an at least manual ppm must take place
To undertake a service we check functionality, interface with controls, electrical test, test of battery back-up if applicable, fan speed test if applicable, lubrication of parts where appropriate
The production of a concise report and certificate of compliance detailing work carried out and complete with any appropriate photographic evidence, and recommendations for any further action required